Preserve Drainage Project begins tomorrow

PRESERVE DRAINAGE PROJECT BEGINS TOMORROW

There has been an ongoing drainage problem behind the condos on the preserve for years. The drainage problem has destroyed the sod behind all buildings from 6502-6526. Three drain pipes per building will be attached to the existing downspouts which will connect to the catch basins.

The drainage project for the condo’s will begin tomorrow.

This should take about a week for completion.

Thank you.

Kymberly Bill
Property Manager
Marbella Lakes H.O.A  “Proudly Managed by GRS Management Associates
6664 Marbella Lane, Naples, FL 34105
| www.marbellalakeshoa.com
D: 239-430-5690 |  F: 239-262-0113

Comments are closed.